THE BRIEF: Leading civil construction company Hazell Bros required a high-impact visual record of the Degilbo Creek bridge installation, designed to capture the scale, precision, and professionalism of their team in action.
THE VISION: The approach was to find the powerful story within the industrial process. Combining a cinematic vision with a seamless and WHS-compliant on-site presence, the goal was to create a visual record that showcases true engineering excellence, using both ground-level and aerial perspectives to capture the project's full scale and capability.